Case Studies

Sun Hung Kai Centre

Sun Hung Kai Centre

180 AHUs installed
24-month payback from Capex 507,384 kWh annual electricity reduction 360,243 kg CO2e Annual Reduction

14.16% Reduction in Fan Power
57.5% Reduction in Pressure Drop
1.65x Increase in PM1 Filtration Efficiency
8.68x Increase in PM2.5 Filtration Efficiency 1.17x Increase in PM10 Filtration Efficiency

30 Harbour Rd, Wan Chai Year of Built: 1981 BEAM Plus Existing Building (Excellent)

EMSD Headquarters

EMSD Headquarters

5,670 kWh Annual Electricity Saving for a single AHU

44.4% Increase in PM10 Filtration Efficiencyt
87.4% Decrease in Pressure Drop
18.4% in Fan Power Energy Saving

30 Harbour Rd, Wan Chai Year of Built: 1981 BEAM Plus Existing Building (Excellent)

ONE TAIKOO PLACE

ONE TAIKOO PLACE

Installed AirSonic TM system in 2021
24 Months Payback
Synergize with VAV control system

11-19% reduction of AHU motor energy use

Taikoo Place, 979 King's Rd, Quarry Bay Year of Built: 2018 Triple Platinum Rating (WELL, BEAM Plus, LEED)

Lincoln House

Lincoln House

Installed AirSonic TM system in 2021

1-10% energy reduction depending on fan motor loading
Synergize with VAV control system

Taikoo Place, 979 King's Rd, Quarry Bay Year of Built:
1998First HKBEAM-awarded building

Ambulance

Ambulance

All HKSAR Government ambulance (450+) vehicles installed AURABEAT Air Handling solution!

OTHER CASE