Case Studies
-
507,384 kWh Electricity Saving Annually
-
360,243 kg CO2 Reduction Annually
-
14.16% Fan Power Reduction
-
5,670 kWh Electricity Saving per AHU Annuall
-
4,026 kg CO2 Reduction per AHU Annually
-
18.4% Fan Power Reduction
-
1,549 kWh Electricity Saving per AHU Annually
-
1,053 kg CO2 Reduction per AHU Annually
-
17.76% Fan Power Reduction
-
234 kWh Electricity Saving per AHU Annually
-
159 kg CO2 Reduction per AHU Annually
-
5.5% Fan Power Reduction
-
Reduce ventilation system workload
-
Reduce infection risk in patient transport cabin
-
HEPA grade air quality for patients and medical professionals
-
507,384 kWh Electricity Saving Annually
-
360,243 kg CO2 Reduction Annually
-
14.16% Fan Power Reduction
-
5,670 kWh Electricity Saving per AHU Annuall
-
4,026 kg CO2 Reduction per AHU Annually
-
18.4% Fan Power Reduction
-
1,549 kWh Electricity Saving per AHU Annually
-
1,053 kg CO2 Reduction per AHU Annually
-
17.76% Fan Power Reduction
-
234 kWh Electricity Saving per AHU Annually
-
159 kg CO2 Reduction per AHU Annually
-
5.5% Fan Power Reduction
-
Reduce ventilation system workload
-
Reduce infection risk in patient transport cabin
-
HEPA grade air quality for patients and medical professionals
Sun Hung Kai Centre
180 AHUs installed
24-month payback from Capex 507,384 kWh annual
electricity reduction 360,243 kg CO2e Annual Reduction
14.16% Reduction in Fan Power
57.5% Reduction in Pressure Drop
1.65x Increase in PM1 Filtration Efficiency
8.68x Increase in PM2.5 Filtration Efficiency
1.17x Increase in PM10 Filtration Efficiency
30 Harbour Rd, Wan Chai Year of Built:
1981 BEAM Plus Existing Building (Excellent)
EMSD Headquarters
5,670 kWh Annual Electricity Saving for a single AHU
44.4% Increase in PM10 Filtration Efficiencyt
87.4% Decrease in Pressure Drop
18.4% in Fan Power Energy Saving
30 Harbour Rd, Wan Chai Year of Built:
1981 BEAM Plus Existing Building (Excellent)
ONE TAIKOO PLACE
Installed AirSonic TM system in 2021
24 Months Payback
Synergize with VAV control system
11-19% reduction of AHU motor energy use
Taikoo Place, 979 King's Rd, Quarry Bay Year of Built:
2018 Triple Platinum Rating (WELL, BEAM Plus, LEED)
Lincoln House
Installed AirSonic TM system in 2021
1-10% energy reduction depending on fan motor loading
Synergize with VAV control system
Taikoo Place, 979 King's Rd, Quarry Bay
Year of Built:
1998First HKBEAM-awarded building
Ambulance
All HKSAR Government ambulance (450+) vehicles installed AURABEAT Air Handling solution!